What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 29 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | THURROCK STORAGE #1 | £15.40 |
| 2 | THURROCK STORAGE #3 | £15.40 |
| 3 | Spalding | £14.25 |
| 4 | Unit 3 | £13.01 |
| 5 | SOUTH HUMBER BANK P/S | £12.43 |
| 6 | Coryton | £11.62 |
| 7 | Lakeside | £11.50 |
| Region | £/MWh |
|---|---|
| South Eastern | £15.4 |
| Yorkshire | £11.5 |
| Midlands | £10.4 |
| Eastern | £10.1 |