What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Coryton | £5.40 |
| 2 | Dollymans | £3.58 |
| 3 | Ffestiniog | £3.30 |
| 4 | Didcot B main 5 | £3.00 |
| 5 | F & S Energy #02 | £2.82 |
| 6 | Swangate | £2.74 |
| 7 | Buxton | £2.71 |
| Region | £/MWh |
|---|---|
| Eastern | £3.3 |
| Yorkshire | £2.7 |
| North Western | £2.7 |