What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 65 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £7.10 |
| 2 | Thame Road | £5.83 |
| 3 | Tye Lane | £5.74 |
| 4 | Nursling | £5.13 |
| 5 | EDF Energy F01C | £5.09 |
| 6 | Cowley | £5.05 |
| 7 | EDFE Aggregate S Eng 02 | £4.78 |
| Region | £/MWh |
|---|---|
| Eastern | £5.7 |
| Southern | £5.1 |
| South Eastern | £5.0 |