What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £33.70 |
| 2 | Tye Lane | £33.03 |
| 3 | Nursling | £32.83 |
| 4 | Cowley | £32.63 |
| Region | £/MWh |
|---|---|
| Eastern | £33.0 |
| Southern | £32.8 |
| South Eastern | £32.6 |