What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £14.07 |
| 2 | Cottam Development Centre | £11.00 |
| 3 | GridBeyond L0DN | £10.19 |
| 4 | Rocksavage | £10.06 |
| 5 | West Burton B 1 | £8.91 |
| 6 | Sizing John | £7.47 |
| 7 | Ocker Hill | £6.80 |
| Region | £/MWh |
|---|---|
| Eastern | £7.5 |
| Midlands | £6.8 |
| South Wales | £6.7 |
| North Western | £4.0 |
| Yorkshire | £3.8 |