What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £3.68 |
| 2 | SOUTH HUMBER BANK P/S | £3.67 |
| 3 | Centrica Business Solutions S05L | £3.38 |
| 4 | Pen y Cymoedd | £3.33 |
| 5 | SSE Energy Supply #01 | £3.24 |
| 6 | Nursling | £3.09 |
| 7 | Cowley | £3.03 |
| Region | £/MWh |
|---|---|
| South Western | £3.7 |
| South Wales | £3.3 |
| Southern | £3.1 |
| South Eastern | £3.0 |
| Eastern | £3.0 |
| Merseyside and North Wales | £2.9 |