What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 49 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £22.67 |
| 2 | Shoreham | £21.34 |
| 3 | Cottam Development Centre | £18.62 |
| 4 | Unit 2 | £15.09 |
| 5 | GridBeyond L0DN | £14.59 |
| 6 | Connah's Quay | £13.51 |
| 7 | Carrington Ltd - 2 | £12.96 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.9 |
| Eastern | £10.8 |
| South Scotland | £8.1 |