What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £48.33 |
| 2 | Shoreham | £44.98 |
| 3 | Seabank Module | £40.78 |
| 4 | Unit 1 | £40.71 |
| 5 | GridBeyond L0DN | £37.21 |
| 6 | Jamesfield 1 | £32.85 |
| 7 | EDFE Aggregate S Eng 02 | £29.29 |
| Region | £/MWh |
|---|---|
| North Scotland | £28.3 |
| North Western | £28.3 |
| South Eastern | £26.4 |
| Eastern | £26.4 |
| Yorkshire | £21.8 |
| South Wales | £19.0 |