What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Nursling | £58.20 |
| 2 | Pivot Kemsley | £57.99 |
| 3 | Tye Lane | £57.97 |
| 4 | Cowley | £57.87 |
| 5 | SUNDON | £57.28 |
| Region | £/MWh |
|---|---|
| Southern | £58.2 |
| Eastern | £58.0 |
| South Eastern | £58.0 |