What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | BESS Holdco 2 N02A | £39.71 |
| 2 | BESS Holdco 2 N03J | £39.71 |
| 3 | Limejump Energy #04 | £38.97 |
| 4 | EDF Energy F01C | £38.11 |
| 5 | Richborough Park 2 | £35.46 |
| 6 | Limejump Energy #05 | £34.24 |
| 7 | Pillswood 1 | £33.01 |
| Region | £/MWh |
|---|---|
| Midlands | £28.8 |
| Yorkshire | £27.7 |
| Northern | £26.0 |
| South Wales | £25.8 |
| South Eastern | £25.4 |
| North Western | £24.8 |
| Eastern | £24.6 |