What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £9.00 |
| 2 | Brigg | £6.79 |
| 3 | Centrica Business Solutions S06B | £6.17 |
| 4 | Hawthorn Pit | £3.92 |
| 5 | Sizing John | £2.83 |
| 6 | F & S Energy #02 | £2.72 |
| 7 | Hunningley Stairfoot | £2.62 |
| Region | £/MWh |
|---|---|
| Yorkshire | £4.9 |
| Northern | £3.9 |
| Eastern | £2.8 |
| Midlands | £2.2 |
| South Wales | £1.6 |