What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 68 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £17.65 |
| 2 | Nursling | £17.33 |
| 3 | SUNDON | £17.25 |
| 4 | EDFE Aggregate S Eng 02 | £17.17 |
| 5 | Larks Green | £17.13 |
| 6 | Zenobe Capenhurst #2 | £17.00 |
| 7 | ClayTye Farm 2 | £16.14 |
| Region | £/MWh |
|---|---|
| South Western | £17.1 |
| Merseyside and North Wales | £17.0 |
| Eastern | £16.2 |
| Southern | £16.1 |
| Midlands | £16.1 |