What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 10 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £5.08 |
| 2 | Sizing John | £4.64 |
| 3 | Native River | £4.41 |
| 4 | Nursling | £4.14 |
| 5 | EDF Energy F01C | £4.08 |
| 6 | Pivot Kemsley | £4.06 |
| 7 | Cowley | £4.00 |
| Region | £/MWh |
|---|---|
| South Eastern | £4.1 |
| Eastern | £3.9 |
| South Western | £3.4 |
| North Western | £3.4 |
| Southern | £3.4 |
| Merseyside and North Wales | £3.2 |
| Midlands | £2.7 |