What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £0.26 |
| 2 | Native River | £0.01 |
| Region | £/MWh |
|---|---|
| South Western | £0.0 |
| Eastern | £0.0 |
| Northern | £0.0 |
| South Wales | £0.0 |
| Yorkshire | £0.0 |