What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 45 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Richborough Park 1 | £55.06 |
| 2 | Richborough Park 2 | £52.88 |
| 3 | Limejump Energy #02 | £50.34 |
| 4 | Limejump Energy #05 | £49.78 |
| 5 | Limejump Energy #02 | £49.04 |
| 6 | Limejump Energy #01 | £46.19 |
| 7 | Ilmer Lane | £40.78 |
| Region | £/MWh |
|---|---|
| South Eastern | £54.8 |
| Southern | £33.9 |
| Eastern | £33.7 |