What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £7.19 |
| 2 | Nursling | £6.47 |
| 3 | SUNDON | £6.43 |
| 4 | Cowley | £6.40 |
| 5 | Tye Lane | £6.39 |
| 6 | EDFE Aggregate S Eng 02 | £6.36 |
| 7 | Zenobe Capenhurst #1 | £6.33 |
| Region | £/MWh |
|---|---|
| Southern | £6.5 |
| Eastern | £6.4 |
| South Eastern | £6.4 |
| Merseyside and North Wales | £6.3 |