What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £54.33 |
| 2 | Nursling | £53.43 |
| 3 | Pivot Kemsley | £53.22 |
| 4 | Tye Lane | £53.14 |
| Region | £/MWh |
|---|---|
| Southern | £53.4 |
| South Eastern | £53.2 |
| Eastern | £53.1 |