What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £79.11 |
| 2 | Nursling | £78.04 |
| 3 | BESS Holdco 2 N02A | £77.35 |
| 4 | BESS Holdco 2 N03J | £77.35 |
| 5 | BESS Holdco 2 EN7H | £76.71 |
| 6 | Octopus Energy #00 | £64.00 |
| 7 | Bloxwich | £63.00 |