What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 1 | £28.74 |
| 2 | Statkraft Markets #09 | £27.35 |
| 3 | Unit 2 | £14.96 |
| 4 | Brigg | £14.01 |
| 5 | Ilmer Lane | £13.46 |
| 6 | Thame Road | £12.64 |
| 7 | ClayTye Farm 2 | £12.63 |
| Region | £/MWh |
|---|---|
| North Scotland | £28.7 |
| Yorkshire | £13.9 |
| Eastern | £12.8 |
| Northern | £10.8 |
| South Eastern | £9.3 |