What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £28.00 |
| 2 | Shoreham | £23.52 |
| 3 | Seabank Module 2 | £19.00 |
| 4 | Centrica Business Solutions S05L | £18.73 |
| 5 | Thame Road | £13.83 |
| 6 | GridBeyond L02E | £13.24 |
| 7 | GridBeyond L08H | £13.24 |