What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Thame Road | £29.55 |
| 2 | Sizing John | £18.36 |
| 3 | Pen y Cymoedd | £17.32 |
| 4 | Lakeside | £17.13 |
| 5 | GridBeyond L02E | £16.12 |
| 6 | GridBeyond L08H | £16.12 |
| 7 | GridBeyond L0DN | £16.12 |
| Region | £/MWh |
|---|---|
| Eastern | £23.6 |
| South Wales | £17.3 |
| Yorkshire | £13.2 |
| Merseyside and North Wales | £11.6 |