What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £2.28 |
| 2 | F & S Energy #02 | £2.27 |
| 3 | Port of Tyne | £2.27 |
| 4 | Hunningley Stairfoot | £2.21 |
| 5 | Native River | £2.20 |
| 6 | Burwell Weirs Drove | £2.00 |
| Region | £/MWh |
|---|---|
| Eastern | £2.3 |
| Northern | £2.3 |
| Yorkshire | £2.2 |
| South Western | £2.2 |