What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 41 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £81.20 |
| 2 | GridBeyond L0DN | £80.87 |
| 3 | Lakeside | £68.88 |
| 4 | Pen y Cymoedd | £56.75 |
| 5 | Carnegie Road 1 | £52.25 |
| 6 | West Burton B 2 | £50.79 |
| 7 | Dollymans | £50.66 |
| Region | £/MWh |
|---|---|
| Yorkshire | £68.9 |
| South Wales | £56.8 |
| Merseyside and North Wales | £52.2 |
| Eastern | £50.7 |
| Northern | £46.0 |