What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Unit 2 | £24.94 |
| 2 | Seabank Module 2 | £21.94 |
| 3 | Unit 1 | £21.94 |
| 4 | GridBeyond L0DN | £13.91 |
| 5 | Wishaw | £11.88 |
| 6 | Holes Bay | £11.38 |
| 7 | Exergy Solutions E00E | £6.90 |
| Region | £/MWh |
|---|---|
| South Scotland | £11.9 |
| Southern | £11.4 |