What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £27.50 |
| 2 | Unit 1 | £21.85 |
| 3 | Seabank Module 2 | £21.85 |
| 4 | GridBeyond L0DN | £13.86 |
| 5 | Skelmersdale | £12.86 |
| 6 | Wishaw | £11.85 |
| 7 | SSE Energy Supply #01 | £6.86 |
| Region | £/MWh |
|---|---|
| North Western | £12.9 |
| South Scotland | £11.9 |