What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Blackpool | £29.29 |
| 2 | Statkraft Markets #01 | £19.17 |
| 3 | ZENOBE BLACKHILLOCK #4 | £18.32 |
| 4 | Carnegie Road 1 | £17.80 |
| 5 | Lakeside | £14.78 |
| 6 | GridBeyond L0DN | £13.83 |
| 7 | Rocksavage | £13.69 |
| Region | £/MWh |
|---|---|
| North Western | £12.8 |
| Yorkshire | £10.9 |
| South Scotland | £9.0 |
| South Eastern | £9.0 |
| North Scotland | £8.4 |
| Eastern | £7.3 |
| Merseyside and North Wales | £7.1 |
| Midlands | £4.2 |