What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £1.20 |
| 2 | EDFE Aggregate S Eng 02 | £0.80 |
| 3 | Tye Lane | £0.73 |
| 4 | ECOTRICITY C05L | £0.67 |
| 5 | Nursling | £0.56 |
| 6 | Pivot Kemsley | £0.54 |
| 7 | SUNDON | £0.52 |
| Region | £/MWh |
|---|---|
| Southern | £0.6 |
| South Eastern | £0.5 |
| Eastern | £0.5 |
| South Western | £0.5 |