What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £243.33 |
| 2 | Unit 1 | £199.46 |
| 3 | Blackpool | £193.53 |
| 4 | GridBeyond L0DN | £121.38 |
| 5 | ClayTye Farm 2 | £110.05 |
| 6 | SSE Energy Supply #01 | £82.53 |
| 7 | Pillswood 2 | £78.20 |
| Region | £/MWh |
|---|---|
| Eastern | £110.1 |
| South Scotland | £75.4 |
| Yorkshire | £74.6 |
| Midlands | £71.4 |
| Northern | £68.5 |