What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 32 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £35.87 |
| 2 | Unit 1 | £28.74 |
| 3 | GridBeyond L0DN | £16.12 |
| 4 | Arbroath | £15.03 |
| 5 | Farnham | £14.28 |
| 6 | Brigg | £13.67 |
| Region | £/MWh |
|---|---|
| North Scotland | £15.0 |
| Southern | £14.3 |
| Yorkshire | £13.7 |