What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 7 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | West Burton B 2 | £31.97 |
| 2 | Thame Road | £28.56 |
| 3 | Lakeside | £28.18 |
| 4 | Unit 2 | £27.24 |
| 5 | Limejump Energy #05 | £26.64 |
| 6 | Statkraft Markets #16 | £26.00 |
| 7 | Carnegie Road 1 | £26.00 |
| Region | £/MWh |
|---|---|
| Eastern | £27.1 |
| Merseyside and North Wales | £26.0 |
| North Western | £25.2 |
| Yorkshire | £23.4 |
| Northern | £22.5 |