What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 1 | £10.16 |
| 2 | Native River | £9.93 |
| 3 | Carnegie Road 1 | £8.33 |
| 4 | EDFE Aggregate S Eng 02 | £8.14 |
| 5 | Little Raith | £8.03 |
| 6 | Tye Lane | £7.76 |
| 7 | Thame Road | £6.92 |
| Region | £/MWh |
|---|---|
| North Scotland | £10.2 |
| South Western | £9.9 |
| Merseyside and North Wales | £8.3 |
| South Scotland | £8.0 |
| Eastern | £7.0 |
| Southern | £6.0 |