What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £12.78 |
| 2 | Staythorpe 3 | £9.69 |
| 3 | Tye Lane | £9.58 |
| 4 | EDF Energy F01C | £9.00 |
| 5 | Dollymans | £8.93 |
| 6 | Grain | £8.87 |
| 7 | BESS Holdco 2 N02A | £8.85 |
| Region | £/MWh |
|---|---|
| Eastern | £8.7 |
| South Eastern | £8.6 |
| Merseyside and North Wales | £7.9 |
| Midlands | £7.7 |
| Southern | £7.6 |
| South Western | £7.5 |