What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 38 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Spalding | £14.27 |
| 2 | Centrica Business Solutions S05L | £13.67 |
| 3 | Keadby-2 Main | £13.63 |
| 4 | Contego | £12.57 |
| 5 | Thame Road | £11.71 |
| 6 | Unit 2 | £10.79 |
| 7 | Statkraft Markets #05 | £10.44 |
| Region | £/MWh |
|---|---|
| South Eastern | £12.6 |
| Eastern | £10.4 |
| Southern | £10.2 |
| South Western | £10.0 |