What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £12.99 |
| 2 | Enfield Centre Ltd BMU1 | £12.71 |
| 3 | SSE Energy Supply #01 | £12.16 |
| 4 | West Burton B 1 | £11.29 |
| 5 | Tye Lane | £11.29 |
| 6 | Unit 2 | £11.16 |
| 7 | Spalding | £11.14 |