What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £9.40 |
| 2 | ClayTye Farm 2 | £7.44 |
| 3 | Thame Road | £7.29 |
| 4 | Arbroath | £7.25 |
| 5 | Brigg | £6.97 |
| 6 | Ocker Hill | £6.84 |
| 7 | EDFE Aggregate S Eng 02 | £6.80 |
| Region | £/MWh |
|---|---|
| North Scotland | £7.2 |
| Eastern | £7.0 |
| Midlands | £6.8 |
| Yorkshire | £6.7 |
| Northern | £5.3 |
| South Wales | £5.2 |
| North Western | £4.5 |
| South Eastern | £4.1 |