What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pen y Cymoedd | £1.80 |
| 2 | EDFE Aggregate S Eng 02 | £1.78 |
| 3 | Tye Lane | £1.70 |
| 4 | Keadby-2 Main | £1.69 |
| 5 | Thame Road | £1.68 |
| 6 | Centrica Business Solutions S06B | £1.59 |
| 7 | Grain | £1.59 |
| Region | £/MWh |
|---|---|
| South Wales | £1.8 |
| Eastern | £1.7 |
| Southern | £1.4 |