What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | HawkersHill | £11.85 |
| 2 | Lakeside | £11.73 |
| 3 | Ocker Hill | £10.98 |
| 4 | Unit 2 | £10.80 |
| 5 | Hirwaun | £9.50 |
| Region | £/MWh |
|---|---|
| Southern | £11.9 |
| Yorkshire | £11.7 |
| Midlands | £11.0 |
| South Wales | £9.5 |