What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Spalding | £23.29 |
| 2 | Rocksavage | £19.05 |
| 3 | ClayTye Farm 1 | £16.82 |
| 4 | F & S Energy #02 | £15.06 |
| 5 | Native River | £13.92 |
| 6 | Chapel Farm | £13.77 |
| 7 | Port of Tyne | £13.14 |
| Region | £/MWh |
|---|---|
| Eastern | £14.3 |
| South Western | £13.9 |
| Northern | £13.1 |
| Yorkshire | £10.1 |