What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £3.03 |
| 2 | Seabank Module 2 | £3.00 |
| 3 | Unit 1 | £2.95 |
| 4 | EDFE Aggregate S Eng 02 | £2.61 |
| 5 | Larks Green | £2.57 |
| 6 | Native River | £2.53 |
| 7 | ECOTRICITY C05L | £2.48 |
| Region | £/MWh |
|---|---|
| South Western | £2.6 |
| South Wales | £2.2 |
| Midlands | £2.1 |
| Yorkshire | £2.0 |
| Northern | £2.0 |
| Eastern | £1.9 |
| South Scotland | £1.9 |
| South Eastern | £1.8 |