What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDFE Aggregate N Scot 1 | £6.02 |
| 2 | Contego | £5.28 |
| 3 | Coupar | £5.25 |
| 4 | F & S Energy #02 | £4.52 |
| 5 | Byers Brae | £4.44 |
| 6 | Hunningley Stairfoot | £4.17 |
| 7 | Limejump Energy #04 | £3.88 |
| Region | £/MWh |
|---|---|
| South Eastern | £5.3 |
| North Scotland | £5.3 |
| South Scotland | £4.4 |
| Yorkshire | £4.2 |
| Eastern | £3.5 |