What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £4.83 |
| 2 | Marchwood | £4.72 |
| 3 | Hunningley Stairfoot | £4.68 |
| 4 | Burwell Weirs Drove | £4.62 |
| Region | £/MWh |
|---|---|
| South Western | £4.8 |
| Yorkshire | £4.7 |
| Eastern | £4.6 |