What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 5 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Enfield Centre Ltd BMU1 | £25.30 |
| 2 | Cottam Development Centre | £25.30 |
| 3 | UKPR MANW | £23.63 |
| 4 | UKPR East Mids | £23.63 |
| 5 | Rocksavage | £23.63 |
| 6 | Ilmer Lane | £23.36 |
| 7 | Grain | £23.36 |
| Region | £/MWh |
|---|---|
| Eastern | £23.2 |
| North Western | £22.6 |
| South Scotland | £22.5 |
| Southern | £22.5 |