What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £0.19 |
| 2 | EDFE Aggregate N Scot 1 | £0.17 |
| 3 | Unit 1 | £0.12 |
| 4 | UKPR MANW | £0.08 |
| 5 | Chapel Farm | £0.06 |
| 6 | UKPR East Mids | £0.04 |
| 7 | Pillswood 1 | £0.04 |
| Region | £/MWh |
|---|---|
| Eastern | £0.1 |
| North Western | £0.0 |
| Yorkshire | £0.0 |
| Northern | £0.0 |