What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 15 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £35.54 |
| 2 | Cottam Development Centre | £31.82 |
| 3 | Pembroke 31 | £30.90 |
| 4 | SSE Energy Supply #01 | £29.31 |
| 5 | Contego | £17.50 |
| 6 | Chapel Farm | £16.81 |
| 7 | Pillswood 2 | £16.00 |
| Region | £/MWh |
|---|---|
| South Eastern | £17.5 |
| Eastern | £16.8 |
| Yorkshire | £11.5 |
| Merseyside and North Wales | £11.4 |