What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 22 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 1 | £9.02 |
| 2 | Keadby-2 Main | £8.67 |
| 3 | Pillswood 1 | £7.83 |
| 4 | Immingham CHP | £7.63 |
| 5 | Enfield Centre Ltd BMU1 | £7.18 |
| Region | £/MWh |
|---|---|
| Yorkshire | £7.8 |