What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 18 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Carrington Ltd - 1 | £10.35 |
| 2 | Keadby-2 Main | £10.00 |
| 3 | Brigg | £9.49 |
| 4 | Immingham CHP | £8.94 |
| 5 | Enfield Centre Ltd BMU1 | £8.49 |
| 6 | Native River | £7.75 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.5 |
| South Western | £7.7 |