What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £8.67 |
| 2 | UKPR S East | £8.47 |
| 3 | Buxton | £8.00 |
| 4 | Brigg | £7.77 |
| 5 | Immingham CHP | £7.74 |
| 6 | Unit 1 | £7.74 |
| 7 | Thame Road | £7.57 |
| Region | £/MWh |
|---|---|
| South Western | £8.5 |
| Merseyside and North Wales | £6.7 |
| Yorkshire | £6.5 |
| North Western | £6.4 |
| Eastern | £6.1 |
| Northern | £5.8 |
| South Eastern | £5.0 |
| Midlands | £4.9 |
| South Wales | £4.4 |