What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 39 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £1.04 |
| 2 | Pillswood 2 | £1.04 |
| 3 | Wormald Green | £0.97 |
| 4 | Statkraft Markets #16 | £0.96 |
| 5 | Native River | £0.96 |
| 6 | SUNDON | £0.95 |
| 7 | UKPR S East | £0.93 |
| Region | £/MWh |
|---|---|
| Eastern | £1.0 |
| Northern | £1.0 |
| Yorkshire | £1.0 |
| South Western | £0.9 |