What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Pembroke 31 | £11.30 |
| 2 | Limejump Energy #04 | £11.29 |
| 3 | Drax | £10.77 |
| 4 | Cottam Development Centre | £10.25 |
| 5 | Carnegie Road 1 | £10.11 |
| 6 | Richborough Park 2 | £9.88 |
| 7 | F & S Energy #01 | £9.75 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £10.1 |
| South Eastern | £9.6 |
| Eastern | £9.5 |
| South Western | £9.0 |
| Yorkshire | £8.9 |
| Northern | £8.0 |
| South Wales | £7.7 |