What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Coupar | £16.60 |
| 2 | EDFE Aggregate N Scot 1 | £15.17 |
| 3 | Pillswood 2 | £14.72 |
| 4 | Wormald Green | £13.53 |
| 5 | Tye Lane | £13.33 |
| Region | £/MWh |
|---|---|
| North Scotland | £16.6 |
| Yorkshire | £14.7 |
| Northern | £13.5 |
| Eastern | £13.3 |